Yokogawa Integral Oxygen Analyzer ZR202 Manuel d'utilisateur Page 135

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 157
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 134
<11.Inspection and Maintenance>
11-6
IM 11M12A01-04E
Replacement of heater assembly
Refer to Figure 11.4 as an aid in the following discussion.
Remove U-shaped pipe support , U-shaped pipe , Filter and the sensor (cell) , following
Section 11.1.2, earlier in this manual.
Remove the two screws that tighten the cover and slide it to the ange side. Remove the four
bolts to remove the converter . Then remove the three connectors to which leadwire from the
heater and thermocouple is connected.
Loosen screw until heater assembly 󰚨 plate can be removed. Theres no need to remove O-ring
which prevents screw from dropping out. Pull out connector . Loosen and remove the screw
with a special wrench (part no. K9470BX or equivalent) and then remove the heater assembly 󰚨 from
the detector 󰚩.
To reassemble the heater assembly, reverse the above procedure:
Insert the heater assembly 󰚨 into the detector 󰚩, while inserting the calibration pipe in the detector
󰚩 into the heater section in the heater assembly 󰚨 as well as in the bracket hole. Coat the screw
with grease (Never-Seez: G7067ZA) and tighten the screw with a special tool (part no. K9470BX or
equivalent) with a tightening torque of 12N·m ± 10%.
Next, to install the O-rings on the calibration-gas and reference-gas pipes, disassemble the
connector in the following procedure:
First, remove the screw 󰚪 and then remove the plate and two caps . If the O-ring remains
in the hole, pull them out from the back. Pass the heater and thermocouple leadwire through the
connector . Also, pass the calibration gas and reference gas pipes through the opening of the
connector . If the O-ring fails, replace it with a new one.
Push the two caps into the associated opening of the connector . Insert the plate , aligning it
with the groove of the cap , and tighten it with the screw 󰚪. If you attempt to insert the calibration
gas and reference gas pipes into the connector without disassembling the connector , the O-ring
may be damaged. Tighten screw in the heater assembly 󰚨 until connector can’t move.
Reassemble in reverse order to the above disassembly procedure.
When installing the cell assembly , replace the metal O-ring with a new one.
11.1.4 Replacement of Dust Filter
Set the dust lter in place using a special pin spanner (with a pin 4.5 mm in diameter: part no.
K9471UX or equivalent). If a dustlter that has already been replaced once is used again, apply
grease (Never-Seez: G7067ZA) to the threads of the dust lter.
11.1.5 Replacement of O-ring
The detector uses three different types of O-rings , 󰚜, and . One O-ring alone , or two O-rings
󰚜 and are used. (For a pressure compensating model, two O-rings are used for individual uses.
Two O-rings 󰚜 and are used for reference gas sealing and require periodic replacement.
11.1.6 Stopping and Re-starting Operation
<Stopping Operation>
When operation is stopped, take care of the followings so that the sensor of the detector cannot
become unused.
Vue de la page 134
1 2 ... 130 131 132 133 134 135 136 137 138 139 140 ... 156 157

Commentaires sur ces manuels

Pas de commentaire