Yokogawa DAQWORX Manuel d'utilisateur Page 48

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 100
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 47
2-37
IM WX11-01E
Creating Monitor Screens with AddObserver Builder
1
2
3
4
Index
4.
Drag the cursor to the location of the opposite corner of the meter set.
A meter set is created using the two corner points specified in steps 3 and 4.
5.
Move the cursor to the channel you wish to assign to the meter set on the channel
page of the operation panel.
6.
Drag the channel to the meter set.
(1) Drag the channel you wish to assign.
(2) Drop the channel plate on the meter set.
2.15 Creating Meter Sets
Vue de la page 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 99 100

Commentaires sur ces manuels

Pas de commentaire