Yokogawa FieldMate Manuel d'utilisateur Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 84
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
<2 OUTILINE>
2-4
IM 01R01A11-01EN
2.3 Operation Procedure
Figure 2.3.1 summarizes operation procedure.
To complete “Standard VF”, start-up Verication Tool fromSegment Viewer”. See 4.1.
4 START-UP
1 to 3 PREPARATION
4.1 Segment Viewer 4.2 Device Navigator
4.3 Verification Data
in “Device Maintenance Info”
4.4 History
5 LAUNCHING
Use the existing data?
5.3 General Information
No. New data Yes
6.1 Main Screen
8 TERMINATION
6.3 Enhanced VF
(Optional)
5.2 Load
6.2 Standard VF
(Mandatory)
Save the verification data ?
No Yes
6.1.2 Save
6.1.3 Print out
6.4 Result
Verification
Operation
Verification Tool and AXF: OfflineVerification Tool and AXF: Online
Verification Tool and AXF
Online
Offline
Online Offline
IMPOSSIBLE
IMPOSSIBLE
FieldMate and AXF
F020301.ai
Figure 2.3.1 Operation Procedure
Vue de la page 11