Yokogawa GC1000 Mark II Process Gas Chromatograph Manuel d'utilisateur Page 36

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 77
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 35
<Toc> <Ind> <4. Outline of Software >
4-1
IM 11B03A03-01E 3rd Edition : Aug. 23. 2006-00
4. Outline of Software
4.1 Status and Operation Mode
The GC1000 Mark II has the following statuses:
Process: Normal measurement, calibration and validation
Manual: Manual operation
Lab: Measurement with automatic peak detection, like a laboratory GC
The GC1000 Mark II has the following operation modes:
Stop: Mode in which the measurement stops
Run: Mode in which the measurement is running
Pause: Mode in which the measurement pauses
Figure 4.1 shows the transitions of statuses and operation modes.
Pause mode Run mode Run mode
Stop mode Stop mode
Process Manual
Run command
Run
command
Run
command
Stop command
Change the status Change the status
Stop
command
Stop command
Pause command
Pause
command
Run mode
Stop mode
Lab
Run
command
Stop
command
F0401.EPS
Figure 4.1 Status and Operation Mode Transition Diagram
When the LCD panel on the GC1000 Mark II or the LCD emulator on a personal computer
(PC) connected with the GC1000 Mark II is used, by changing the operation panel to the
manual operation panel or lab operation panel, the status will change from Process to
Manual or Lab. Likewise, by changing the manual operation panel or lab operation panel
to the operation panel, the status will change from Manual or Lab to Process.
When the GCMT on a PC connected with the GC1000 Mark II is used, the status can be
changed through command button operation or menu-driven operation.
The following pages describe each status and operation in detail.
Vue de la page 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 76 77

Commentaires sur ces manuels

Pas de commentaire